pg1 | pg2 | pg3 | pg 4 | pg 5 | pg 6

Malaysia’s Prime Minister officiates at the official opening ceremony of
the new Sungai Muda Bridge (a fast-track Project completed in 8 months
at the Rt. Hon. Prime Minister’s Parliamentary Constituency in Penang).
5th September 2006

Main Contractor: Lejadi Infra Sdn. Bhd.

The new Sungai Muda Bridge which has been completed within a construction period of 8.5 months - a month ahead of schedule, by Lejadi Infra Sdn. Bhd. as the Main Contractors.

Y.A.B. Prime Minister officiates at the formal Opening Ceremony of the Sungai Muda Bridge (with Y.A.B. Dato’ Seri Mahadzir Khalid, Menteri Besar Kedah, on Y.A.B. Prime Minister’s left).
The full capacity crowd present during the Opening Ceremony on the bridge deck itself.
Directors & Staff of Lejadi Infra Sdn. Bhd. pose against the stage backdrop with Y.Bhg., Tan Sri Zaini Omar (in blue batik), the former D.G., of Public Works Dept. (J.K.R.) after the ceremony.
6th March 2008,....the stage is set for the launch of a People's Project awarded to Lejadi Infra Sdn Bhd to enhance facilities and capacity at the Penang General Hospital.

Project Launch of Hospital Pulau Pinang’s Upgrading Works and new, iconic Heart & Surgical Centre under the 9th Malaysia Plan – 6th March 2008

Prime Minister Y.A.B. Dato’ Seri Abdullah Hj Ahmad Badawi; Y.A.Bhg., Datin Seri Jeanne Abdullah, Y.A.Bhg., Puan Sri Chui Kah Peng; K.S.N., Y.Bhg., Tan Sri Mohd Sidek Hassan and D.G. Health, Y.Bhg., Tan Sri Dr. Mohd Ismail Merican on stage during the launch ceremony

Then Prime Minister, YAB Dato’ Seri Abdullah Hj Ahmad Badawi (now YAB Tun) is seen perusing a lit scale model of Penang GH’s proposed Phase 1 and Phase 2 Development Project with Lejadi Infra’s directors. For the record, Phase 1 was designed and fully built by Lejadi Infra on SCHEDULE (within the specified budget of RM106m) and handed over for full operation in August 2009 after securing CF from the Penang State Authorities. Phase One’s scope included a new Invasive Cardio Lab, new 26-bedded GICU ward, a new 5-bedded Nuclear Medicine Isolation Ward c/w Hot Lab and Office and a 570-bay multi-storeyed car park … indeed a commendable achievement by LISB for a most challenging project.

3rd Floor, Wisma Lejadi, 48-50 Jalan 27/70A, Desa Sri Hartamas, 50480 Kuala Lumpur.
Telephone : 603 - 2300 0888
Fax : 603 - 2300 0883